Regular sand and rock assets lessening, making great sand and rock assets have step by step went to counterfeit creation. This is a pattern, yet additionally a need. A manageable society, green living climate needs more individuals to think about how thorough and productive utilization of assets. Truth be told, wellsprings of unrefined components utilized in assembling an extensive variety of sand, a wide range of metal, endured rock, stream stones, mine tailings, slag thus can be utilized as the source. With long periods of homegrown and unfamiliar creation of counterfeit rock total for a wide range of designing tests show generally excellent execution of fake sand, not the slightest bit mediocre compared to normal assets. proficient framework plan and assembling organization, has for a long time intently around the state made the correct course, strategy situated to showcase needs as the middle, pool innovation, nonstop development plan and production a progression of unique pounding instrument sand gear series. The stream rock Sand is in every case smash hit market starting from the start of creation of fundamental items. Acer mining machine plan and production of framework sand machine enjoys the accompanying benefits can: rock smasher machine
In the first place, stream rock Sand machine air from coursing inside the vortex chamber, dust contamination.
Second, introduce the holding on for an exceptional plan with cutting edge shaft, so the machine has the qualities of weighty and rapid pivot.
Third, the design is basic and sensible, since the strike breakers, the utilization of minimal expense.
Fourth, high dependability, tight security gadgets, to guarantee that gear and individual wellbeing.
Fifth, the framework has a devastating machine sand, coarse crushing capability.
6th, stream rock Sand machine moving along as planned, work commotion, energy productive, high pulverizing effectiveness.
Seven, the weakness of low-misfortune, all wearing parts are great wear-safe materials utilized at home and abroad, long help life. A modest quantity of wear parts made of wear-safe material with an extraordinary hard, little size, light weight, simple to supplant parts.
Eight, by the dampness content of the material is little, the water content up to around 8%. rock creation line
Sand Machine establishment:
1, sand making machine introduced in the substantial groundwork or steel, in light of the establishment ought to have the option to endure multiple times the weight.
2, as per the air terminal to various broken. Introduced in the plant activity or introduced in the open activity. Establishment ought to even out the smasher to the vertical and flat pivot.
3, the framework ought to be set over the sand machine lifting hardware, lifting gear, the biggest limit smasher parts by weight contemplations, the framework ought to be left over the sand lifting machine room, machine side of the sand to remain in the framework, satisfactory room to plan for support during the occasion.
Sand machine troubleshooting:
Stream Sand Rocks machine in the processing plant, the maker possesses little energy for 8 burden activity, the services is typical, in any case, live in the sand making machine after establishment, ought to direct a far reaching examination.
1, Check the oil pipe is associated safely, in addition to a re-dispatching before the oil.
2, check the association of the parts ought to be strong and solid, cautiously take a look at the impeller for unfamiliar items, in the event that any ought to be quickly eliminated.
3, check the engine wiring is right, the voltage is typical (380V ± 5%).
4, the establishment of the belt before you turn over the engine, pivoting sand machine to the framework ought to be signs in a similar course (that is, from the mouth to see the feed, impeller counter-clockwise revolution) in the event that it signs the other way, the engine wiring ought to be changed so pivot and signs in a similar heading, never permitting the counter pivot.
5, for the two-engine drive, axle gathering and the two sides of the engine, separately, with a similar number of three-sided belt and shaft get together associated with the two sides of the triangle ought to be changed a similar belt tensioning and straight. After the check, after the exchange of creation, first for void endlessly load test, the test to affirm no issue and afterward moved to creation.
Tags: